SLI-Group Server Center

General information about the project

SLI-Group Server Center

Project name

1000 square meters

Area of the premises

Building a high-performance server center for commercial activities and supporting the digital city

Project goal

625 million rubles

Budget

Main components of the project

Project goals and objectives

Main goal: Developing server infrastructure with high computing power and scalability for business and digital city.

Tasks:

  1. Placement and configuration of server equipment throughout the entire area of the center.
  2. Ensuring uninterrupted operation of equipment and security systems.
  3. Development and implementation of cooling and backup power supply systems.

Main components and specifications

  1. Number of server racks: 900
  2. Total number of servers: 5400 servers
  3. Computing power: up to 2500 kW
  4. RAM: 691.2 TB
  5. Data storage (SSD and HDD): 54 petabytes
  6. Processors (CPU): Multi-core Intel Xeon or AMD EPYC
  7. Graphics Processing Units (GPUs): For AI and machine learning, NVIDIA Tesla or A100 possible

Work plan and implementation stages

  1. Design and preparation:
    • Analysis of technical requirements and development of an equipment placement plan.
    • Preparing the premises: power supply, cooling and ventilation systems.
    • Ensuring physical security: video surveillance, access control, fire protection systems.
  2. Installation and configuration of equipment:
    • Purchase and delivery of server racks, servers and network equipment.
    • Installation of server racks and placement of servers.
    • Setting up and calibrating the cooling and power supply system.
  3. Integration and testing:
    • Integration of servers and network equipment into a single system.
    • Testing hardware for performance and stability.
    • Optimization and configuration of monitoring and control systems.
  4. Deployment and Operation:
    • Launch of the server center into operation.
    • Connection to external networks and integration with client systems.
    • Setting up service and technical support processes.
  5. Control and support:
    • Organization of round-the-clock monitoring of the server center status.
    • Regular maintenance and updating of equipment.
    • Customer support and technical issues resolution.

Technical requirements for the premises

    • Cooling systems: Liquid cooling and air conditioning.
    • Power supply: Backup power supplies (UPS) and diesel generators.
    • Physical security: CCTV, access control and fire protection systems.

    High-speed network connection: Support 10GbE, 25GbE or 100GbE for high data throughput.

Expected results

  • Commercial activities: Allocating 60% of computing power to serving external clients, providing cloud and virtual services.
  • Digital City: Using 40% of resources to support smart technologies and manage urban infrastructure.

High availability and fault tolerance: Ensuring uninterrupted operation of the server center with round-the-clock monitoring.

Risks and measures to reduce them

  • Equipment Overheating: Implementation of Advanced Liquid Cooling Systems.
  • Power Outage: Use UPS and backup generators to maintain uninterrupted operation.

Cyber Threats: Setting up protective measures and security systems to protect data.

Financial planning and budgeting

    • Equipment purchase: 60% of the budget.
    • Infrastructure and cooling systems: 20% of the budget.
    • Backup power and security: 10% of budget.
    • Installation and integration: 5% of the budget.
    • Unforeseen expenses: 5% of the budget.

This project is aimed at creating a high-performance server center that will be used both for commercial purposes and to support the digital city. Thanks to investments in infrastructure and advanced technologies, the SLI-Group server center will become one of the most powerful in the region, providing customers with reliable and efficient IT solutions.

Консультация

Оставьте заявку на бесплатную консультацию

Специальная цена на все услуги в апреле

Мы вернули цены за 2023 год только до конца апреля. Успейте присоединиться к самой технологичной и коммуникабельной системе.